Installation videos

Pressure Sewer Systems

  • 0:08 Step 1 – Identify tank location
  • 0:51 Step 2 – Delivery & unpacking
  • 1:19 Step 3 – Read manuals & mark tank location
  • 2:23 Step 4 – Excavation procedure
  • 2:53 Step 5 – Inlet setup
  • 3:30 Step 6 – Tank installation
  • 4:23 Step 7 – Discharge line & boundary connection kit
  • 5:36 Step 8 – Install conduit to control panel
  • 6:31 Step 9 – Control panel installation
  • 7:51 Step 10a – Internal level control

Pressure Sewer Systems

  • 0:08 Step 1 – Identify tank location
  • 0:51 Step 2 – Delivery & unpacking
  • 1:19 Step 3 – Read manuals & mark tank location
  • 2:23 Step 4 – Excavation procedure
  • 2:53 Step 5 – Inlet setup
  • 3:30 Step 6 – Tank installation
  • 4:23 Step 7 – Discharge line & boundary connection kit
  • 5:36 Step 8 – Install conduit to control panel
  • 6:31 Step 9 – Control panel installation
  • 7:51 Step 10b – Level transducer

Pressure Sewer Systems

  • 0:09 Step 1 – Identify tank location
  • 0:51 Step 2 – Delivery & unpacking
  • 1:20 Step 3 – Read manuals & mark tank location
  • 2:24 Step 4 – Excavation procedure
  • 2:54 Step 5 – Inlet setup
  • 3:31 Step 6 – Tank installation
  • 4:23 Step 7 – Discharge line & boundary connection kit
  • 5:37 Step 8 – Install conduit to control panel
  • 6:32 Step 9 – Control panel installation
  • 7:52 Step 10c – Float tree level control